Project: Stirling Council Vehicle Restraint System Repairs & Renewal
Location: 5 locations around the Stirling area
Main Contractor: HFBC Ltd
Type of work: VRS Repair and Renewal
Project Summary:
Stirling Council contracted HFBC to remove, repair or renew VRS over 5 different locations around the Stirling area.
Start of project: 14th July 2025
End of project: 29th July 2025
Note: Images 1 and 2 show the Vehicle Restraint System at one location before work commenced. Images 3 and 4 show the new Vehicle Restraint System at that location. Images 5 and 6 show the new Vehicle Restraint System at one of the other locations in Stirling.
HFBC works:
HFBC carried out repairs or replacements of the existing systems over the 5 sites. These works included:
- Repair of existing open box beam systems
- Installing new posts and beams
- Replacement of existing systems with new N2W1, N2W2 and P4 terminals.
Traffic management was erected by Alba TM for all sites.