Project: Stirling Council Vehicle Restraint System Repairs & Renewal

Location: 5 locations around the Stirling area

Main Contractor:​ HFBC Ltd

Type of work: VRS Repair and Renewal

Project Summary:

Stirling Council contracted HFBC to remove, repair or renew VRS over 5 different locations around the Stirling area.

Start of project: 14th July 2025

End of project: 29th July 2025

Note: Images 1 and 2 show the Vehicle Restraint System at one location before work commenced. Images 3 and 4 show the new Vehicle Restraint System at that location. Images 5 and 6 show the new Vehicle Restraint System at one of the other locations in Stirling.

HFBC works:

HFBC carried out repairs or replacements of the existing systems over the 5 sites. These works included:

  • Repair of existing open box beam systems
  • Installing new posts and beams
  • Replacement of existing systems with new N2W1, N2W2 and P4 terminals.

Traffic management was erected by Alba TM for all sites.