Project: Shetland Barriers
Location: B9075, east of Setter, Shetland Islands
Main Contractor: RJ McLeod
Type of work: Installation of Road Restraint Systems – Barrier (N2W1 and N2W2)
Project Summary:
HFBC has completed several projects with RJ McLeod in various locations around Scotland. This project involved a 3-man HFBC squad travelling to Lerwick to install safety barrier. HFBC worked on an existing site, away from other contractors.
Start of project: 14th May 2024
End of project: 29th May 2024
HFBC works:
To supply and install the following:
Location 1
- Steel N2/W2 VGSN 1002 with mesh
- Steel SS N2W1 SPR4 with posts at 2m centres
- Tranzflex connections
- P4 terminals
Location 2
- N2W1 SPR4 with posts
- P4 terminals