Project: Shetland Barriers

Location: B9075, east of Setter, Shetland Islands

Main Contractor:​ RJ McLeod

Type of work: Installation of Road Restraint Systems – Barrier (N2W1 and N2W2)

Project Summary:

HFBC has completed several projects with RJ McLeod in various locations around Scotland. This project involved a 3-man HFBC squad travelling to Lerwick to install safety barrier. HFBC worked on an existing site, away from other contractors.

Start of project: 14th May 2024

End of project: 29th May 2024

HFBC works:

To supply and install the following:

Location 1

  • Steel N2/W2 VGSN 1002 with mesh
  • Steel SS N2W1 SPR4 with posts at 2m centres
  • Tranzflex connections
  • P4 terminals

Location 2

  • N2W1 SPR4 with posts
  • P4 terminals