Project: Naver Bridge Site Clearance & Vehicle Restraint System Installation
Location: Naver Bridge, A836
Main Contractor:Wills Bros
Type of work: Site Clearance & Vehicle Restraint System Installation
Project Summary:
Wills Bros and the Highland Council collaborated on the Naver Bridge Replacement Scheme.
As part of the North Coast 500 tourist route, the bridge replacement was essential for a safer crossing over the river.
Start of project: 12 January 2026
End of project: 13 August 2026
HFBC works:
HFBC carried out site clearance, removing and chipping gorse in 2024 before returning in January 2026 to supply and install the following:
- N2W2 VGSN 1002 parapet with mesh including connections to concrete wall
- N2W4 barrier on driven posts
- N2W3 barrier on driven posts
- N2W2 barrier on driven posts
- single sided P4 Trend Terminals driven
- single sided P2 Trend Terminals driven
- Tranzflex connection from N2 barrier to N2 steel parapet
- Guardrails