Project: HEP21 Inverurie

Main Contractor: Bam Nuttall Ltd

Project Summary:

This project presented a number of challenges including night time working on rail track possessions in remote locations.

The remote location of the rail line required a dedicated train to deliver materials to the working area with these being offloaded by our operatives in a safe and efficient manner. Working trackside obviously required all operatives to be fully PTS trained.

HFBC works:

The construction consisted of:

  • Railway specification stock fencing 12,000m
  • 1.8m high weld mesh fencing 1,000m
  • 1.8m high StrongGuard fencing 160m. This is a high specification fence designed to restrain errant vehicles and prevent access to rail property.
Supply and installation of railway specification fencing HEP21 Inverurie
Railway stock fencing Security Scotland
Supply and installation of fencing HEP21 Inverurie
Supply and installation of fencing HEP21 Inverurie