Project: Inchlaggan VRS Barrier Installation
Location: Inchlaggan
Main Contractor: RJ Macleod
Type of work: VRS Barrier Installation
Project Summary:
Highland Council contracted RJ Macleod to arrange installation of VRS barrier. This is in relation to the Skye Reinforcement Project, improving infrastructure for future development.
Start of project: 14th July 2026
End of project: 16th July 2026
HFBC works:
HFBC were contracted by RJ MacLeod to: –
- Dig out and concrete in, single sided N2W1 barrier which included convex radius on a concave radius system in the line.
- Includes P4 trend terminals
HFBC carried out push testing prior to the works.