Project: Balmenach Distillery Groundworks and Surfacing

Location: Cromdale, Grantown-on-Spey

Main Contractor:​ HFBC Ltd

Type of work: Groundworks / Surfacing

Project Summary:

To install drainage and resurface area

Start of project: 24th June 2024

End of project: 3rd July 2024

HFBC works:

Balmenach Distillery contracted HFBC Ltd to supply and install: –

  • ACO drains to tie into existing manhole
  • Remove tar and level out subbase
  • Lay AC60mm and HRA 40mm tar layer