Project: Security Fencing for Beasdale WWTW
Location: Beasdale WWTW, Highlands
Main Contractor: Ross-shire Engineering
Type of work: Security Fencing Installation
Project Summary:
Scottish Water contracted Ross-shire Engineering, who in turn appointed HFBC to supply and install security fencing around the Beasdale WWTW.
HFBC installed lego blocks to build up the surrounding area.
Start of project: 10th November 2025
End of project: 18th November 2025
HFBC works:
To supply and install: –
- Weldmesh fence with 3 barb wire on top, to form a boundary for water tanks with a weldmesh pedestrian gate
- Timber post and 4-line wire fence
- Timber post and 5 rail fence
To install: –
- Lego concrete blocks