Project: Aberarder Wind Farm Temporary Post and Rail Fence

Location: Dunmaglass, Inverness-shire

Main Contractor:​ Global Infrastructure

Type of work: Temporary Post and Rail Fence

Project Summary:

The Aberarder Wind Farm project is located in Strathnairn near Inverness, on a natural plateau at an average of 700m above sea level. It will sit directly adjacent to the operational 94MW Dunmaglass Wind Farm, which is jointly owned by SSE Renewables and Greencoat UK Wind. While construction is underway, the wind farm is expected to be operational by the end of 2026 with 12 wind turbines.

Start of project: 6th May 2025

End of project: 14th May 2025

HFBC works:

To supply and install temporary post and rail fencing with concrete footings.