Project: A831 Polmaily Bridge Parapet and Barrier Installation
Location: A831, Glenurquhart (Drumnadrochit to Cannich)
Main Contractor: Strath Civil Engineering
Type of work: Parapet and Barrier Installation
Project Summary:
Highland Council contracted Strath Civils to repair 4 bridges on the Drumnadrochit to Cannich stretch of the A831.
Start of project: 23rd October 2024
End of project: 1st November 2024
HFBC works:
HFBC were contracted to carry out the VRS installation on one of the bridges which included the supply and installation of N2W2 SPR4 concrete in system with sockets for posts, ABC terminals and sockets for posts and N2W2 VGSN1002 parapet with mesh, complete with 3 parapet connections.