Project: Sittenham Bends Barrier
Location: Dalnavie, near Ardross Primary School
Main Contractor: HFBC
Type of work: Removal and installation of Road Restraint Systems – Barrier
Project Summary:
HFBC and Highland Council continue to complete successful projects together. This particular project involved replacing a section of barrier that had suffered several vehicle strikes.
Start of project: 18th March 2024
End of project: 20th March 2024
HFBC works:
Project works included the following:
- HFBC set up a 2-way TM with lights and full signage.
- Take down existing barrier to ground level and supply and install new N2W2 barrier with posts installed into sockets in concrete log.
- Install 2 P4 terminals.