Project: Kincraig VRS Safety Barrier and Footpath

Location: A9 – near Kincraig

Main Contractor:​ Kincraig & Vicinity Community Council

Type of work: VRS Safety Barrier

Project Summary:

Kincraig Community Council awarded HFBC with this contract, which included barrier works and a footpath connection.

This project required a full 2-way traffic management plan to be in place, with lights and signage. This was installed by HFBC operatives and taken down at the end of each workday.

Start of project: 15th Nov 2023

End of project: 1st Dec 2023

HFBC works:

To supply and install the following:

  • Initial setup of the traffic management system for site with full signage
  • Extra over for installing AC10 close surf & for removal of VRS

New VRS

  • Supply and install N2W1 single sided safety barrier and P2 terminal
  • Supply and install TCB full height anchor

Existing VRS

  • Take down existing beams and breakdown posts
  • Reinstall existing beams on new posts

Line Marking

  • To carry out line marking of ‘SLOW’

Additional Items

  • Dig out the remainder of the path
  • Lay terram
  • Lay flat kerbs on both sides of the path
  • Lay and roll subbase
  • Lay tactile paving
  • Postcrete finger post and ‘one way’ post
  • Install additional signs and roadside reflectors
  • Fully inspect path and tidy