Project: Upper Achintore Fencing
Location: Ross Place Pitch, Fort William
Main Contractor: TSL Contractors
Type of work: Fencing
Project Summary:
TSL invited HFBC to price for the upgrading of an existing sports pitch. Prior to commencing work, HFBC completed the TSL approved subcontractor process.
This project was completed within 5 days, and HFBC looks forward to working with TSL on future projects.
Start of project: 6th November 2023
End of project: 10th November 2023
HFBC works:
Supply and install the following:
- 108 metres of double wire panel system (2m high complete with rebound to 1.2 metre & 60×40 RHS posts at 2.520m centres complete with full length clamp bar)
- 2m rebound goal recess 4.8m x1.2m
- Basketball post, back board and hoop
- 1 single leaf gate and 1 double leaf gate
- 30m of timber post and 5 wire