Project: A886 Strachur Barriers & Fencing
Location: Strachur, east coast of Loch Fyne
Main Contractor: Taziker
Type of work: Barrier and Fencing
Project Summary:
The aim of this project was to remediate the failed section of slope and support the A886 road carriageway by constructing and installing a retention system which was founded to be on bedrock.
Taziker were appointed as main contractor with HFBC awarded the barrier and fencing subcontract.
Start of project: February 2023
End of project: February 2023
HFBC works:
Barrier
To supply and install the following:
- Approx. 60m of single sided N2W2 safety barrier complete with sockets.
- 24m of N2W1 complete with sockets.
- 2 number P4 Trend terminals.
Fencing
To supply and install 25m of bolt down timber post and 3 rail fencing.