Project: A886 Strachur Barriers & Fencing

Location: Strachur, east coast of Loch Fyne

Main Contractor: Taziker

Type of work: Barrier and Fencing

Project Summary:

The aim of this project was to remediate the failed section of slope and support the A886 road carriageway by constructing and installing a retention system which was founded to be on bedrock.

Taziker were appointed as main contractor with HFBC awarded the barrier and fencing subcontract.

Start of project: February 2023

End of project: February 2023

HFBC works:

Barrier

To supply and install the following:

  • Approx. 60m of single sided N2W2 safety barrier complete with sockets.
  • 24m of N2W1 complete with sockets.
  • 2 number P4 Trend terminals.

Fencing

To supply and install 25m of bolt down timber post and 3 rail fencing.