Project: Branshogle Bridge Barrier

Location: Balfron near Stirling

Main Contractor: Stirling Council

Type of work: Barrier

Project Summary:

Branshogle Bridge was closed in March 2021 after partially collapsing during a period of heavy rainfall. Extensive repairs to the bridge included construction of the concrete deck, bridge deck backfilling, road widening and re-surfacing, and safety barrier installation.

Stirling Council awarded HFBC the barrier package.

Start of project: January 2023

End of project: January 2023

HFBC works:

The installation of the following:

  • 4 no. single sided N2 non connection transitions in concrete foundations
  • 60m N2W2 single sided flexbeam in concrete foundations
  • 60m N2W1 single sided flexbeam in concrete foundations
  • 1 no. P2 Trend single sided terminal in concrete foundations
  • 3 no. P4 Trend single sided terminals in concrete foundations