Project: VRS Upgrade in Morar

Location: Mallaig, Loch Morar

Installation & Completion: September 22

Main Contractor: Highland Council

Type of work: VRS Upgrade

Project Summary:

HFBC were awarded the contract for the upgrading of barrier to comply with current standards

HFBC works:

To supply and install the following:

  • 11.2m of varioguard on concrete strip
  • 1 no. connection from varioguard to flexbeam
  • 8m N2W2 flexbeam
  • 140m N2W3 flexbeam
  • 1 no. P4 terminal

The flexbeam and P4 terminal were installed concrete in with sockets.