Project: Singleton Glen Ord Distillery
Location: Muir of Ord
Main Contractor: Thomas Johnstone Ltd
Type of work: Fencing
Project Summary:
Thomas Johnstone were awarded the contract to carry out the full refurbishment of the existing visitor centre.
HFBC works:
Fencing – We supplied and installed a specialist design of prefabricated panels and timber fence and a relocation of an existing gate.
Whilst on site we were also asked to carry out groundworks such as the breaking out and removal of Monoblock and tar, and the removal of sub-base and sharp sand.
Start of project: February 2022
End of project: March 2022