Project: Westlink
Location: Inverness
Main Contractor: RJ McLeod
Type of work: Parapet and Barrier
Project Summary:
The Westlink project in Inverness is a significant development for the area. The Highland Council approved the plans for the Swing bridge over the canal, to reduce delays from the bridge opening and, to allow canal traffic to pass. The two bridges will work in tandem to make sure one route is always available to traffic.
The works for the Westlink were divided into two sections for construction. Our barrier and parapet work is being carried out under the second stage of the project.
HFBC works:
We installed and supplied the following:
- All road restraints systems (N2W4, Tranzflex, P4 terminals)
- All road parapets (N2W2 and N2W1)
Start of Project: October 2020
End of Project: Ongoing